Summary of Typical Reference  Plants  


PROJECT INFORMATION

PROJECT PICTURE

Project Name

CPC Plant of JV between Sinoway and Dubal


Capacity

280kt/a

Designed in

2017

Put into operation

2019

Key Parameters of VSF

·        76 tanks

·        4 VSFs

·        8layer flue

Location of Project

Jiangsu, China

SAMI’s Scope of Service

EPC

PROJECT INFORMATION

PROJECT PICTURE

Project Name

CPC Plant of Sunstone Development Co., Ltd

Capacity

251,700 t/a

Designed in

Jan. 2014

Put into operation

Oct.2015

Key Parameters of VSF

·           76 tanks;

·           4 VSFs;

·           8 layer flue;

Location of Project

Gansu, China

SAMI’s Scope of Service

·        License of VSK technology

·         Basic engineering design

·         Detailed engineering design

PROJECT INFORMATION

PROJECT PICTURE

Project Name

CPC Plant of James DurransSons Ltd



Design Date

        2017.05

Start Up

2019.03

CPC Capacity

12kt/a

Flue Layers

8

Shafts/Tanks

16

Discharge Capacity

80 kg/tank.h


PROJECT INFORMATION

PROJECT PICTURE

Project Name

670kt/a CPC PLANT FOR SAUDI CALCINED PETROLEUM COKE CO.

Design Date

2018.03

EPC Contract

2018.12

CPC Capacity      

670kt/a

VSF Furnace

12

Shafts/Tanks 

56

Discharge Capacity

120 kg/tank.h

List of Reference Plants


In the recent 10 years, the market share of SAMI’s VSF technology in  China has accounted for 90%. The table below lists SAMI’s historical  achievements in this industry:



No.

Name

Location

Annual

Capacity (t/a)

Year of Contract Signing

1

Sunstone Company Yunnan Carbon Plant                     

Yunnan,

China

900,000

2019

2

Inner Mongolia Mengyuan Carbon Plant

Inner Mongolia,

China

600,000

2018

3

Prebaked Anode Project of QiangQiang Carbon Co., Ltd

Guangxi, China

200,000

2017

4

Innovation Project of Shanxi Advanced Co. Ltd

Shanxi,

China

280,000

2017

5

Fushun Carbon Plant

Fushun,

China

350,000

2017

6

Shandong Xinfa Smelter

Shandong,

China

300,000

2016

7

East Hope Group Xinjiang Carbon Engineering

Xinjiang, China

300,000

2015

8

Xinjiang Jiarun Aluminium and Anode Project

Xinjiang,

China

250,000

2014

9

Sunstone Company Gansu Carbon Project (Phase II)

Gansu,

China

340,000

2014

10

Anode Project of HuomeiTongshun Carbon Company

Inner Mongolia,

China

150,000

2013

11

East Hope Group Xinjiang Carbon Engineering (Phase II)

Xinjiang,

China

300,000

2013

12

Henan Shenhuo Group Xinjiang Carbon Factory (Phase II)

Xinjiang, China

200,000

2012

13

Turkery ETI Aluminium Renovation Project

Turkey

50,000

2012

14

Liaoning Zhongwang Aluminum Co., Ltd 700kt/a High-refined Aluminum & Fabricated Materials Porject

Yingkou,

China

500,000

2012

15

Shandong HuayuAluminum Electricity Co. Ltd Carbon Renovation Project

Shandong,

China

45,000

2011

16

Shandong Chuangxin Group Carbon Ltd. Company

Shandong,

China

600,000

2011

17

East Hope Group Xinjiang Carbon Engineering (Phase I)

Xinjiang, China

200,000

2011

18

Henan Shenhuo Group Xinjiang Carbon Factory (Phase I)

Xinjiang, China

200,00

2011


Home Page|Contact Us|About Us|Corporate Culture

Aluminium Corp all rights reserved by Beijing ICP -1 No. 05024156 Beijing public security 110401000017

Address: the people's Republic of China Beijing, Haidian District Xizhimen North Street No. 62