EN
Summary of Typical Reference Plants
PROJECT INFORMATION | PROJECT PICTURE | |
Project name | ETI GTC project for 300kA smelter in Turkey | |
Treatment | CC reactor | |
Project mode | EPC | |
Particles | 5mg/Nm3 | |
Total F | 0.8mg/Nm3 | |
Year of start | 2017 |
PROJECT INFORMATION | PROJECT PICTURE | |
Project name | Zhongrun GTC project for 500kA smelter | |
Treatment | CC reactor | |
Project mode | EPC | |
Particles | 5mg/Nm3 | |
SO2 | 35mg/Nm3 | |
Total F | 0.5mg/Nm3 | |
Year of start | 2018 |
List of Reference Plants
The reference plants shown in the list below only demonstrated the plants in EPC mode of GTC project done by SAMI. As the design of GTC is part of the project of aluminum smelter, the plants related to GTC design are not listed here, please refer to the List of Reference Plants for Aluminum.
No. | Project | Year of construction | Year of start | Project mode | Treatment technology |
Pot gas treatment center (GTC) | |||||
1 | Liancheng GTC project for 500kA smelter | 2011 | 2012 | EPC | CC reactor |
2 | JISCO Longxi GTC project for 400kA smelter | 2011 | 2011 | EPC | CC reactor |
3 | Liancheng GTC modification project for 200kA smelter | 2012 | 2012 | EPC | CC reactor |
4 | Liancheng GTC project for 600kA pilot plant | 2013 | 2013 | EPC | CC reactor |
5 | Datong GTC project for 400kA smelter | 2014 | 2015 | EPC | CC reactor |
6 | ETI GTC project for 300kA smelter in Turkey | 2015 | 2017 | EPC | CC reactor |
7 | Huolinhe GTC modification project for 350kA smelter | 2016 | 2016 | EPC | CC reactor |
8 | Zhongfu GTC modification project for 400kA smelter | 2016 | 2016 | EPC | CC reactor |
9 | Zhongrun GTC project for 500kA smelter | 2017 | 2018 | EPC | CC reactor |
Aluminium Corp all rights reserved by Beijing ICP -1 No. 05024156 Beijing public security 110401000017
Address: the people's Republic of China Beijing, Haidian District Xizhimen North Street No. 62