EN

Summary of Typical Reference Plants  

PROJECT INFORMATION

PROJECT PICTURE

Project

Sunstone Jiayuguan Phase II for large baking  furnace

Capacity of single furnace

340kt/a

Designed in

August, 2014

Put into operation

November, 2015

Number of sections

72

Number of pits

14

Energy consumption

1.8GJ/t. anode

Labor productivity

3000t/person

PROJECT INFORMATION

PROJECT PICTURE

Project

Baking furnace project in ETI aluminium  smelter

Capacity

49kt/a

Designed in

August, 2014

Put into operation

January, 2017

Number of sections

36

Number of pits

5

Energy consumption

2.4GJ/t. anode

PROJECT INFORMATION

PROJECT PICTURE

Project

Baking furnace project in FunshunAluminum Co., Ltd of  Chalco

Capacity

350kt/a

Designed in

May, 2018

Put into operation

April, 2019

Number of sections

76

Number of pits

14

Energy consumption

1.8 GJ/t. anode

List of Reference Plants

The total production capacity of baking furnaces adopting SAMI's  technology is around 7,000,000 t/a. By using SAMI's technology, the quality of  prebaked anode is good and the eligible rate is not lower than 99.5%. The  average energy consumption is around 2.0 GJ/t-Anode.


No.

Name

Location

Annual

Capacity (t/a)

Year of Contract  Signing

1

Sunstone Company Yunnan Carbon Plant                     

Yunnan,

China

900,000

2019

2

Inner Mongolia Mengyuan Carbon Plant

Inner Mongolia,

China

600,000

2018

3

Prebaked Anode Project of QiangQiang Carbon Co., Ltd

Guangxi, China

200,000

2017

4

Innovation Project of Shanxi Advanced Co. Ltd

Shanxi,

China

280,000

2017

5

Fushun Carbon Plant

Fushun,

China

350,000

2017

6

Shandong Xinfa Smelter

Shandong,

China

300,000

2016

7

East Hope Group Xinjiang Carbon Engineering

Xinjiang, China

300,000

2015

8

Xinjiang Jiarun Aluminium and Anode Project

Xinjiang,

China

250,000

2014

9

Sunstone Company Gansu Carbon Project (Phase II)

Gansu,

China

340,000

2014

10

Anode Project of HuomeiTongshun Carbon Company

Inner Mongolia,

China

150,000

2013

11

East Hope Group Xinjiang Carbon Engineering (Phase II)

Xinjiang,

China

300,000

2013

12

Henan Shenhuo Group Xinjiang Carbon Factory (Phase II)

Xinjiang, China

200,000

2012

13

Turkery ETI Aluminium Renovation Project

Turkey

50,000

2012

14

Liaoning Zhongwang Aluminum Co., Ltd 700kt/a High-refined Aluminum  & Fabricated Materials Porject

Yingkou,

China

500,000

2012

15

Shandong HuayuAluminum Electricity Co. Ltd Carbon Renovation  Project

Shandong,

China

45,000

2011

16

Shandong Chuangxin Group Carbon Ltd.  Company

Shandong,

China

600,000

2011

17

East Hope Group Xinjiang Carbon Engineering (Phase  I)

Xinjiang, China

200,000

2011

18

Henan Shenhuo Group Xinjiang Carbon Factory (Phase  I)

Xinjiang, China

200,00

2011

Home Page|Contact Us|About Us|Corporate Culture

Aluminium Corp all rights reserved by Beijing ICP -1 No. 05024156 Beijing public security 110401000017

Address: the people's Republic of China Beijing, Haidian District Xizhimen North Street No. 62